featured-image

Share this Story : Trillium Line reliability tops 99 per cent on Day 2 of testing Copy Link Email X Reddit Pinterest LinkedIn Tumblr Breadcrumb Trail Links News Local News Trillium Line reliability tops 99 per cent on Day 2 of testing The 14-day trial running period began Monday. Get the latest from Blair Crawford straight to your inbox Sign Up Author of the article: Blair Crawford Published Oct 09, 2024 • Last updated 25 minutes ago • 2 minute read Join the conversation You can save this article by registering for free here . Or sign-in if you have an account.

The O-Train is tested along the Trillium Line near Corso Italia Station in Little Italy on Wednesday. Photo by JULIE OLIVER / Postmedia Article content The Trillium Line LRT rolled through its second day of trial running Tuesday, achieving a 99.4-per-cent reliability rating.



That topped the Day 1 rating of 98.3 per cent, which was a hair-breadth away from the 98.5 per cent the trains must meet in a rolling average over the 14-day trial run.

Tuesday’s results brought the rolling average over the first two days of testing to 98.9 per cent, meaning the trial run remained on track to wrap up on Oct. 21.

Advertisement 2 Story continues below This advertisement has not loaded yet, but your article continues below. THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY Subscribe now to read the latest news in your city and across Canada. Exclusive articles from Elizabeth Payne, David Pugliese, Andrew Duffy, Bruce Deachman and ot.

Back to Health Page